V0#025 Proposal of steel Y-column core filling with chemical around 4th storey rev.01
This record consists of general correspondence regarding the revised proposal of steel Y-column core filling with chemical around 4th storey of BRACU new campus building.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | Spanish / Castilian |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20599 |
Registros relacionados
-
V0#025 Proposal of steel Y-column core filling with chemical around 4th storey
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Beam slab wall column of 4th floor of BRAC University new campus project
por: WEB Structures
Publicado em: (2023) -
Coordination drawing of 4th storey (Architectural As Built Drawings)
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2024) -
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
4th storey detail layout plan 5 of 6_Rev A
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023)