The impact of failure to perform the design contract of BRAC University new campus project
This record consists of general correspondence regarding the impact of failure to perform the design contract of BRAC University new campus project.
Hoofdauteur: | |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20578 |