The impact of failure to perform the design contract of BRAC University new campus project
This record consists of general correspondence regarding the impact of failure to perform the design contract of BRAC University new campus project.
المؤلف الرئيسي: | |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20578 |