Removal of precast piles
This record consists of general correspondence regarding the shop drawing coordination meeting of Brac University new campus development project .
Autor Principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | Spanish / Castilian |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/20566 |
Títulos similares
-
Valuation for cutting rebar of foundation pile
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Resubmission of cutting hosting rebar of foundation piles
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Additional jet grouting pile
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
V0.04-Valuation of jet grouting piles in the northwest area
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)