Notice: Commencing the retaining pile and jet grouting pile in Zone C
This record consists of general correspondence regarding the notice of commencing retaining pile and jet grouting pile in Zone C of BRACU new campus project.
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20529 |
Benzer Materyaller
-
Additional jet grouting pile
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Regarding cement brand of jet grouting pile
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
V0.04-Valuation of jet grouting piles in the northwest area
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Confirmation for delivery of jet grouting equipment
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Pilecap And Raft - Basement 3 ( Zone A & zone C)
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023)