Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project
This record consists of general correspondence regarding Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project.
Yazar: | BUCG-ABC Joint Venture |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20493 |
Benzer Materyaller
-
Regarding adding drawings of elevator switch box and wiring tube of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
Comparative analysis between Siemens Elevator and other competitors
Yazar:: Harun, Md Redwan Ibna
Baskı/Yayın Bilgisi: (2024) -
Main elevations (Architectural Consultant Drawings)
Yazar:: WOHA Designs PTE LTD
Baskı/Yayın Bilgisi: (2023) -
Main elevations of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2024) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)