Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project
This record consists of general correspondence regarding Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20493 |
Gelijkaardige items
-
Regarding adding drawings of elevator switch box and wiring tube of BRAC University new campus project
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
Comparative analysis between Siemens Elevator and other competitors
door: Harun, Md Redwan Ibna
Gepubliceerd in: (2024) -
Main elevations (Architectural Consultant Drawings)
door: WOHA Designs PTE LTD
Gepubliceerd in: (2023) -
Main elevations of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)