Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project
This record consists of general correspondence regarding Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20493 |
समान संसाधन
-
Regarding adding drawings of elevator switch box and wiring tube of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture
प्रकाशित: (2023) -
Comparative analysis between Siemens Elevator and other competitors
द्वारा: Harun, Md Redwan Ibna
प्रकाशित: (2024) -
Main elevations (Architectural Consultant Drawings)
द्वारा: WOHA Designs PTE LTD
प्रकाशित: (2023) -
Main elevations of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2024) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023)