Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project
This record consists of general correspondence regarding Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project.
Egile nagusia: | BUCG-ABC Joint Venture |
---|---|
Formatua: | General correspondence |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/20493 |
Antzeko izenburuak
-
Regarding adding drawings of elevator switch box and wiring tube of BRAC University new campus project
nork: BUCG-ABC Joint Venture
Argitaratua: (2023) -
Comparative analysis between Siemens Elevator and other competitors
nork: Harun, Md Redwan Ibna
Argitaratua: (2024) -
Main elevations (Architectural Consultant Drawings)
nork: WOHA Designs PTE LTD
Argitaratua: (2023) -
Main elevations of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2024) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023)