Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project
This record consists of general correspondence regarding Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project.
Hlavní autor: | BUCG-ABC Joint Venture |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20493 |
Podobné jednotky
Podobné jednotky
-
Regarding adding drawings of elevator switch box and wiring tube of BRAC University new campus project
Autor: BUCG-ABC Joint Venture
Vydáno: (2023) -
Comparative analysis between Siemens Elevator and other competitors
Autor: Harun, Md Redwan Ibna
Vydáno: (2024) -
Main elevations (Architectural Consultant Drawings)
Autor: WOHA Designs PTE LTD
Vydáno: (2023) -
Main elevations of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2024) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)