Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
主要作者: | BUCG-ABC Joint Venture |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20476 |
相似書籍
-
Connection with City Corporation sewage pipeline
由: Brac University
出版: (2023) -
PIT details of BRAC University new campus project
由: Electro-Mechanical Control Services (EMCS)
出版: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2024) -
Certificate for the construction materials of BRAC University new campus project
由: Brac University
出版: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023)