Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20476 |
Những quyển sách tương tự
-
Connection with City Corporation sewage pipeline
Bằng: Brac University
Được phát hành: (2023) -
PIT details of BRAC University new campus project
Bằng: Electro-Mechanical Control Services (EMCS)
Được phát hành: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2024) -
Certificate for the construction materials of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)