Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Автор: | BUCG-ABC Joint Venture |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/20476 |
Схожі ресурси
-
Connection with City Corporation sewage pipeline
за авторством: Brac University
Опубліковано: (2023) -
PIT details of BRAC University new campus project
за авторством: Electro-Mechanical Control Services (EMCS)
Опубліковано: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2024) -
Certificate for the construction materials of BRAC University new campus project
за авторством: Brac University
Опубліковано: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023)