Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Yazar: | BUCG-ABC Joint Venture |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20476 |
Benzer Materyaller
-
Connection with City Corporation sewage pipeline
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
PIT details of BRAC University new campus project
Yazar:: Electro-Mechanical Control Services (EMCS)
Baskı/Yayın Bilgisi: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2024) -
Certificate for the construction materials of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)