Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20476 |
Liknande verk
-
Connection with City Corporation sewage pipeline
av: Brac University
Publicerad: (2023) -
PIT details of BRAC University new campus project
av: Electro-Mechanical Control Services (EMCS)
Publicerad: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2024) -
Certificate for the construction materials of BRAC University new campus project
av: Brac University
Publicerad: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023)