Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Главный автор: | BUCG-ABC Joint Venture |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20476 |
Схожие документы
-
Connection with City Corporation sewage pipeline
по: Brac University
Опубликовано: (2023) -
PIT details of BRAC University new campus project
по: Electro-Mechanical Control Services (EMCS)
Опубликовано: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2024) -
Certificate for the construction materials of BRAC University new campus project
по: Brac University
Опубликовано: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023)