Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
1. autor: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20476 |
Podobne zapisy
-
Connection with City Corporation sewage pipeline
od: Brac University
Wydane: (2023) -
PIT details of BRAC University new campus project
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2024) -
Certificate for the construction materials of BRAC University new campus project
od: Brac University
Wydane: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)