Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20476 |
Gelijkaardige items
-
Connection with City Corporation sewage pipeline
door: Brac University
Gepubliceerd in: (2023) -
PIT details of BRAC University new campus project
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
Certificate for the construction materials of BRAC University new campus project
door: Brac University
Gepubliceerd in: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)