Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
第一著者: | BUCG-ABC Joint Venture |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20476 |
類似資料
Payment of electricity bills of BRAC University new campus project
著者:: Brac University
出版事項: (2023)
著者:: Brac University
出版事項: (2023)
類似資料
-
Connection with City Corporation sewage pipeline
著者:: Brac University
出版事項: (2023) -
PIT details of BRAC University new campus project
著者:: Electro-Mechanical Control Services (EMCS)
出版事項: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2024) -
Certificate for the construction materials of BRAC University new campus project
著者:: Brac University
出版事項: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)