Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Autore principale: | BUCG-ABC Joint Venture |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20476 |
Documenti analoghi
-
Connection with City Corporation sewage pipeline
di: Brac University
Pubblicazione: (2023) -
PIT details of BRAC University new campus project
di: Electro-Mechanical Control Services (EMCS)
Pubblicazione: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2024) -
Certificate for the construction materials of BRAC University new campus project
di: Brac University
Pubblicazione: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023)