Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20476 |
समान संसाधन
-
Connection with City Corporation sewage pipeline
द्वारा: Brac University
प्रकाशित: (2023) -
PIT details of BRAC University new campus project
द्वारा: Electro-Mechanical Control Services (EMCS)
प्रकाशित: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2024) -
Certificate for the construction materials of BRAC University new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023)