Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Autor Principal: | BUCG-ABC Joint Venture |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/20476 |
Títulos similares
-
Connection with City Corporation sewage pipeline
por: Brac University
Publicado: (2023) -
PIT details of BRAC University new campus project
por: Electro-Mechanical Control Services (EMCS)
Publicado: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2024) -
Certificate for the construction materials of BRAC University new campus project
por: Brac University
Publicado: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)