Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20476 |
Documents similaires
-
Connection with City Corporation sewage pipeline
par: Brac University
Publié: (2023) -
PIT details of BRAC University new campus project
par: Electro-Mechanical Control Services (EMCS)
Publié: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2024) -
Certificate for the construction materials of BRAC University new campus project
par: Brac University
Publié: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023)