Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Päätekijä: | BUCG-ABC Joint Venture |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20476 |
Samankaltaisia teoksia
-
Connection with City Corporation sewage pipeline
Tekijä: Brac University
Julkaistu: (2023) -
PIT details of BRAC University new campus project
Tekijä: Electro-Mechanical Control Services (EMCS)
Julkaistu: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2024) -
Certificate for the construction materials of BRAC University new campus project
Tekijä: Brac University
Julkaistu: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)