Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20476 |
Παρόμοια τεκμήρια
-
Connection with City Corporation sewage pipeline
ανά: Brac University
Έκδοση: (2023) -
PIT details of BRAC University new campus project
ανά: Electro-Mechanical Control Services (EMCS)
Έκδοση: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2024) -
Certificate for the construction materials of BRAC University new campus project
ανά: Brac University
Έκδοση: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023)