Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
1. Verfasser: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20476 |
Ähnliche Einträge
-
Connection with City Corporation sewage pipeline
von: Brac University
Veröffentlicht: (2023) -
PIT details of BRAC University new campus project
von: Electro-Mechanical Control Services (EMCS)
Veröffentlicht: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2024) -
Certificate for the construction materials of BRAC University new campus project
von: Brac University
Veröffentlicht: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023)