Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Hlavní autor: | BUCG-ABC Joint Venture |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/20476 |
Podobné jednotky
-
Connection with City Corporation sewage pipeline
Autor: Brac University
Vydáno: (2023) -
PIT details of BRAC University new campus project
Autor: Electro-Mechanical Control Services (EMCS)
Vydáno: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2024) -
Certificate for the construction materials of BRAC University new campus project
Autor: Brac University
Vydáno: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023)