Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
প্রধান লেখক: | BUCG-ABC Joint Venture |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20476 |
অনুরূপ উপাদানগুলি
-
Connection with City Corporation sewage pipeline
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
PIT details of BRAC University new campus project
অনুযায়ী: Electro-Mechanical Control Services (EMCS)
প্রকাশিত: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2024) -
Certificate for the construction materials of BRAC University new campus project
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023)