Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20476 |
مواد مشابهة
-
Connection with City Corporation sewage pipeline
بواسطة: Brac University
منشور في: (2023) -
PIT details of BRAC University new campus project
بواسطة: Electro-Mechanical Control Services (EMCS)
منشور في: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2024) -
Certificate for the construction materials of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)