Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Glavni avtor: | |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online dostop: | http://hdl.handle.net/10361/20476 |
id |
10361-20476 |
---|---|
record_format |
dspace |
spelling |
10361-204762023-09-04T21:02:44Z Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project BUCG-ABC Joint Venture New campus project General correspondence Electrical pipeline Construction drawing This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project. 2023-09-04T04:44:45Z 2023-09-04T04:44:45Z ©2019 2019-11-18 General correspondence Ref. no.: BUCG-ABC JV/BRACU/139/19 http://hdl.handle.net/10361/20476 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 2 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project General correspondence Electrical pipeline Construction drawing |
spellingShingle |
New campus project General correspondence Electrical pipeline Construction drawing BUCG-ABC Joint Venture Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project |
description |
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project. |
format |
General correspondence |
author |
BUCG-ABC Joint Venture |
author_facet |
BUCG-ABC Joint Venture |
author_sort |
BUCG-ABC Joint Venture |
title |
Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project |
title_short |
Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project |
title_full |
Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project |
title_fullStr |
Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project |
title_full_unstemmed |
Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project |
title_sort |
rework and material waste due to change of electrical pipeline construction drawing of brac university new campus project |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/20476 |
work_keys_str_mv |
AT bucgabcjointventure reworkandmaterialwasteduetochangeofelectricalpipelineconstructiondrawingofbracuniversitynewcampusproject |
_version_ |
1814307079998930944 |