Regarding issues that affect the execution of permanent retaining wall
This record consists of general correspondence regarding the issues that affect the execution of permanent retaining wall of BRACU new campus project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20463 |
Míreanna comhchosúla
-
Regarding issues that affect the execution of permanent retaining wall
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding landscape works
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023) -
Waterproofing for retaining wall
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)