Clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project
This record consists of general correspondence regarding clarification on quotation and submission of BOQ without price for facade curtain, window, vertical louver works of BRAC University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20454 |
Những quyển sách tương tự
Những quyển sách tương tự
-
Submitting final design, drawing and BOQ of facade immediately
Bằng: Brac University
Được phát hành: (2023) -
Submitting Final design, drawing and BOQ of facade within 20.02.2020
Bằng: Brac University
Được phát hành: (2023) -
Clarification on proposal VO#031 of facade curtain wall works rev.0
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Request to release balance amount under BOQ 3.6
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Toilet partition works [BOQ item no. 8.1.12]
Bằng: Brac University
Được phát hành: (2023)