The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20452 |
Liknande verk
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
av: Brac University
Publicerad: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Rectification of the PF value
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
av: Brac University
Publicerad: (2023) -
Rectification of D-Wall
av: Brac University
Publicerad: (2023)