The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20452 |
類似資料
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
著者:: Brac University
出版事項: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Rectification of the PF value
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
著者:: Brac University
出版事項: (2023) -
Rectification of D-Wall
著者:: Brac University
出版事項: (2023)