The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
מחבר ראשי: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/20452 |
פריטים דומים
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
מאת: Brac University
יצא לאור: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Rectification of the PF value
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
מאת: Brac University
יצא לאור: (2023) -
Rectification of D-Wall
מאת: Brac University
יצא לאור: (2023)