The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20452 |
Similar Items
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
by: Brac University
Published: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Rectification of the PF value
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
by: Brac University
Published: (2023) -
Rectification of D-Wall
by: Brac University
Published: (2023)