The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20452 |
Eitemau Tebyg
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
gan: Brac University
Cyhoeddwyd: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Rectification of the PF value
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
gan: Brac University
Cyhoeddwyd: (2023) -
Rectification of D-Wall
gan: Brac University
Cyhoeddwyd: (2023)