The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20452 |
Ítems similars
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
per: Brac University
Publicat: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Rectification of the PF value
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
per: Brac University
Publicat: (2023) -
Rectification of D-Wall
per: Brac University
Publicat: (2023)