The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
This record consists of general correspondence regarding the engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A) of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20452 |
مواد مشابهة
-
The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
بواسطة: Brac University
منشور في: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Rectification of the PF value
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding the deviation in the groove making & pit width at north zone escalator
بواسطة: Brac University
منشور في: (2023) -
Rectification of D-Wall
بواسطة: Brac University
منشور في: (2023)