Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20446 |
Схожие документы
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
по: BUCG-ABC Joint Venture
Опубликовано: (2023) -
Engineer's instruction to construct draining box around building ground
по: Brac University
Опубликовано: (2023) -
Entrance & box drain ( Box drain drawing)
по: WOHA Designs PTE LTD, и др.
Опубликовано: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
по: WEB Structures
Опубликовано: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
по: BUCG-ABC Joint Venture
Опубликовано: (2023)