Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20446 |
Registros relacionados
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado em: (2023) -
Engineer's instruction to construct draining box around building ground
por: Brac University
Publicado em: (2023) -
Entrance & box drain ( Box drain drawing)
por: WOHA Designs PTE LTD, et al.
Publicado em: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
por: WEB Structures
Publicado em: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
por: BUCG-ABC Joint Venture
Publicado em: (2023)