Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20446 |
Podobne zapisy
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Engineer's instruction to construct draining box around building ground
od: Brac University
Wydane: (2023) -
Entrance & box drain ( Box drain drawing)
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
od: WEB Structures
Wydane: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
od: BUCG-ABC Joint Venture
Wydane: (2023)