Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20446 |
Documenti analoghi
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
di: BUCG-ABC Joint Venture
Pubblicazione: (2023) -
Engineer's instruction to construct draining box around building ground
di: Brac University
Pubblicazione: (2023) -
Entrance & box drain ( Box drain drawing)
di: WOHA Designs PTE LTD, et al.
Pubblicazione: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
di: WEB Structures
Pubblicazione: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
di: BUCG-ABC Joint Venture
Pubblicazione: (2023)