Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
מחבר ראשי: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/20446 |
פריטים דומים
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
מאת: BUCG-ABC Joint Venture
יצא לאור: (2023) -
Engineer's instruction to construct draining box around building ground
מאת: Brac University
יצא לאור: (2023) -
Entrance & box drain ( Box drain drawing)
מאת: WOHA Designs PTE LTD, et al.
יצא לאור: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
מאת: WEB Structures
יצא לאור: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
מאת: BUCG-ABC Joint Venture
יצא לאור: (2023)