Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Auteur principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20446 |
Documents similaires
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
par: BUCG-ABC Joint Venture
Publié: (2023) -
Engineer's instruction to construct draining box around building ground
par: Brac University
Publié: (2023) -
Entrance & box drain ( Box drain drawing)
par: WOHA Designs PTE LTD, et autres
Publié: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
par: WEB Structures
Publié: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
par: BUCG-ABC Joint Venture
Publié: (2023)