Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/20446 |
Ejemplares similares
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Engineer's instruction to construct draining box around building ground
por: Brac University
Publicado: (2023) -
Entrance & box drain ( Box drain drawing)
por: WOHA Designs PTE LTD, et al.
Publicado: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
por: WEB Structures
Publicado: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
por: BUCG-ABC Joint Venture
Publicado: (2023)