Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20446 |
Similar Items
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
by: BUCG-ABC Joint Venture
Published: (2023) -
Engineer's instruction to construct draining box around building ground
by: Brac University
Published: (2023) -
Entrance & box drain ( Box drain drawing)
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
by: WEB Structures
Published: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
by: BUCG-ABC Joint Venture
Published: (2023)