Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20446 |
Ähnliche Einträge
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023) -
Engineer's instruction to construct draining box around building ground
von: Brac University
Veröffentlicht: (2023) -
Entrance & box drain ( Box drain drawing)
von: WOHA Designs PTE LTD, et al.
Veröffentlicht: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
von: WEB Structures
Veröffentlicht: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
von: BUCG-ABC Joint Venture
Veröffentlicht: (2023)