Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
প্রধান লেখক: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20446 |
অনুরূপ উপাদানগুলি
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
অনুযায়ী: BUCG-ABC Joint Venture
প্রকাশিত: (2023) -
Engineer's instruction to construct draining box around building ground
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Entrance & box drain ( Box drain drawing)
অনুযায়ী: WOHA Designs PTE LTD, অন্যান্য
প্রকাশিত: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
অনুযায়ী: WEB Structures
প্রকাশিত: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
অনুযায়ী: BUCG-ABC Joint Venture
প্রকাশিত: (2023)