Engineer's instruction to construct draining box around building ground of BRAC University new campus project
This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20446 |
Những quyển sách tương tự
-
Request to issue site instruction for draining box around building ground of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023) -
Engineer's instruction to construct draining box around building ground
Bằng: Brac University
Được phát hành: (2023) -
Entrance & box drain ( Box drain drawing)
Bằng: WOHA Designs PTE LTD, et al.
Được phát hành: (2023) -
Layout, details, plan and section of box drain of BRAC University new campus project
Bằng: WEB Structures
Được phát hành: (2023) -
Architectural shop drawing of box drain (RFA-263_Rev H)
Bằng: BUCG-ABC Joint Venture
Được phát hành: (2023)